Solutions/Onshore Wind Farms

Onshore Wind Farms

In remote, high-altitude, or sloped terrain, every meter of road and every cubic meter of rock excavation impacts the project's IRR.

L.IN.E.A™ optimizes wind-farm access roads and logistics corridors for cost, slope, and earthworks in early planning.

Networks of access roads

Use Infraspace AI engine to connect pads via a network of roads that respects strict slope limits (e.g. under 10%) for crane transport while minimizing earthworks.

Hardstands optimization

Automatically identify optimal locations for turbine pads by analyzing topography and geotechnical constraints.Determine the optimal hardstand location by optimizing elevation, orientation, and even the geometry of the platform itself.

Metric that matters

One wind project team reduced estimated access-road construction costs by 50% (7.9 MNOK3.5 MNOK) while validating crane-transport constraints and road geometry in a single day.

Read the wind farm access road case study

Trusted by industry leaders